Industriezone van Tangshi, Gaobu-stad, DongGuan-de Provincie van Stadsguangdong, China | bella@zehuimach.com |
|
Productdetails:
Betalen & Verzenden Algemene voorwaarden:
|
Afmeting (L*W*H): | L2500*W8300*H1500mm | Maximum spoel materiële breedte: | W1650/2150mm |
---|---|---|---|
Voorwaarde: | Nieuwe | spanning: | 380V |
Gewicht:: | 950kg | Spoel materiële snelheid: | 50m/min |
Macht (W): | 0.75KW | Verleende naverkoop de Dienst: | Ingenieurs beschikbaar aan de dienstmachines overzee |
Producttype: | Netto schuim | Garantie: | Een jaar |
Measuring length For Roll Sponge High Precision Coil Stock Measure Machine
To measure a variety of fabrics,including foam,cloth
The primary purpose is to measure a variety of fabrics,including foam,cloth and pack them into finished product.
model |
QHFH-1650
|
QHFH-2150 |
Reel material width max | 1650mm |
2150mm
|
Reel material speed
|
50m/min
|
50m/min |
Machine weight
|
950kg | 1000kg |
Power
|
0.75kw | 0.75kw |
Machine external size | L2500 * W8300 * H1500mm |
L3000 * W800 * H1400mm
|
Marks:
|
|||||
1. According to seller's standard designed drawing diagrame to arrange the production and inspection.
|
|||||
2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer.
|
|||||
3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shippment (The bank charge for buyer's account).
|
|||||
4. Delivery forms: Send to ShenZhen Seaport
|
|||||
5. Spare parts: Offer assorted maintain tools.
|
|||||
6. Package: paper & film package.
|
|||||
7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%)
|
|||||
8. Delivery date: 45 days (after seller get the advance).
|
|||||
9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account.
|
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1 engineer help to install the machine you must send someone to help about 2 days installation will finished and the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q: What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q: During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some pictures we will help to handle within 24hours.
130KW PE Schuim Netto het Maken Machine, EPE-Zakkenschuim Productiemateriaal
EPE-Schuim die Machine, het Schuimmachine van het Lage Drukpolyurethaan met Siemens Invertor maken
Volledige Automatische Matras Productiemachines, Industriële Schuimmachine voor Bank/Schoenen
Automatische de Sponsproductielijn van het Geheugenpolyurethaan met de Omschakelaar van Siemens
Productielijn van de polystyreen de Flexibele Spons/Ononderbroken Schuimende Machine voor Matras
PE Schuimblad/Sponsproductielijn voor Schuimend Matras en Meubilair
Verticale Schuimmatras die tot Machine maken Handverrichting met Snelheid 30~40 R/Min
De auto Horizontale het Schuimsnijmachine van de Sponscirkel/CNC Machine van de Schuimsnijder
Industriële Verticale Schuimsnijder voor Sponsmatras, Cnc Eps Snijmachine
Spoortype van het het Schuimblad van het Schuimblok de Snijmachine Horizontale PLC Controle